For a school that wants solar but has no capital budget, a power purchase agreement (PPA) looks like the obvious route: someone else pays for the panels and the school buys the electricity. In 2026 that route exists, but in England it is being reshaped by the Department for Education (DfE) — and the question of whether it can deliver a car park canopy rather than a roof array has no official answer yet. This article sets out what DfE has published, what it has not, and what a school can prepare now.

How a school solar PPA works

DfE describes the model plainly: a private sector provider finances, installs and maintains solar panels at no upfront cost to the school or college, and the school buys the electricity the panels generate at a pre-agreed rate.

Two expectations in DfE’s land transaction guidance shape any deal:

  • The school is expected to have first call on, and be able to use, 100% of the electricity generated, and it must only pay for the electricity it consumes.
  • Because the provider owns equipment on school land, DfE requires a lease of the land concerned, not a licence or any other type of occupational agreement.

The first point matters more for a canopy than for a roof. A school uses little power in the summer holiday, which falls in the months when solar output peaks. If the school only pays for what it uses, the provider carries the risk on everything else — so expect the provider to size the canopy carefully to the school’s daytime, term-time demand.

DfE’s pilot: 150 schools, three regions

DfE is piloting PPAs with up to 150 schools and colleges as part of the first phase of its renewal and retrofit programme, in Yorkshire and the Humber, the East Midlands and the South East. It is not an application scheme: if a school or college is eligible, DfE contacts it. Final selection was due to conclude at the end of summer 2026, with procurement starting in autumn 2026. DfE says it hopes all schools and colleges will have the opportunity to procure renewable energy this way from the 2027–28 financial year.

Why school PPA approvals are paused

The biggest change came on 15 July 2026. From that date, any PPA for the school estate must use DfE’s PPA and land lease template, and DfE is not approving new cases while it tests the template. Once testing is complete it will publish the templates and resume approvals, which it expects to happen in autumn 2026. When we checked on 17 September 2026, the guidance had not been updated since 16 July.

In practice, a school outside the pilot that signs a provider’s own PPA today would be signing a contract DfE has said it will not approve in that form.

Roof first — so where does a canopy fit?

DfE’s guidance for cases outside the pilot says they are submitted for solar panel installation on the roof of buildings in good condition, and that applications will not be approved where the roof condition is poor. Its guidance on land transactions adds that DfE’s preferred approach is for solar to be installed “on a rooftop or alternative structure rather than installing solar at ground level rendering school land unusable”.

Read together, those lines point in one direction for a canopy. A canopy over an existing staff car park is an “alternative structure”: it does not take playground or playing-field space, and it is the obvious option where the roof is in poor condition, due for replacement or too small. But DfE has not said whether its PPA and land lease template covers car park canopies, and the government’s other school solar programmes describe their installations as rooftop. Until the template is published, a canopy PPA is a question to raise with DfE, not a product to buy.

A canopy also brings things a roof array does not: a steel structure on its own foundations, a planning route of its own (in England, Class OA permitted development after a prior approval application), and usually a longer programme. How those work for school sites is covered in our guide to solar PV school canopies.

The consents a PPA canopy needs

A PPA puts a third party’s equipment on school land for many years, so the land rules apply in full:

  • Academies must obtain DfE’s prior approval to grant a leasehold interest, including a tenancy, of any duration in their land or buildings (paragraph 5.25 of the 2025 Academy Trust Handbook; 5.26 in the 2026 handbook, which takes effect on 1 October 2026).
  • Where a local authority holds the school land, disposing of it needs the Secretary of State’s prior consent — and under Schedule 1 to the Academies Act 2010, granting a lease counts as a disposal.
  • Form E is DfE’s supplemental form for granting a lease or disposing of land to allow solar PV equipment on a school site. The case needs to show the terms are not unduly onerous or unusual, that the school tried to secure public funding first where it was available, and why the chosen deal offers the best value for money.

Lease or energy contract? The accounting question

This is where a school needs its auditor before it needs a provider.

  • Maintained schools: since IFRS 16 was introduced for local authorities on 1 April 2024, there is no accounting distinction between operating and finance leases at maintained schools, and under the Education Act 2002 all leases are classed as borrowing needing the Secretary of State’s consent — unless covered by DfE’s blanket consent. The 2024 blanket consent covers LED lighting sourced through DfE’s buying routes; it does not list solar.
  • Academies: from 1 September 2026, academy trusts apply the lease accounting in Charities SORP 2026, a single lessee model under the revised FRS 102 rather than IFRS 16 directly. DfE’s pre-approved list covers leases for LED lighting “or to support renewable activity” where sourced with DfE’s support; other leases, which may include leases of land and buildings, go to the Secretary of State for consent. Operating leases already in place before 31 August 2026 do not need new consent.
  • Energy contracts: from 1 October 2026, the Academy Trust Handbook requires trusts to use DfE’s Energy for Schools service or a DfE-approved energy deal unless they source an alternative with comparable pricing.

DfE has not said whether an on-site solar PPA counts as a lease in academy accounts or as an energy contract under the 2026 handbook. That single answer can change which approvals a deal needs, so get it in writing from your auditor.

What a school can do now

  1. Check whether you are in a pilot region — Yorkshire and the Humber, the East Midlands or the South East — and whether DfE has contacted you.
  2. Get evidence on roof condition. It decides whether DfE sees a roof array or an alternative structure as the right answer.
  3. Collect a year of half-hourly electricity data. Under a “pay only for what you use” PPA, term-time daytime demand drives the size of the system a provider will offer.
  4. Prepare the Form E case, including your search for public funding first.
  5. Do not sign a non-template PPA while DfE approvals are paused.
  6. Plan EV charging separately. State-funded schools can claim up to £2,000 per socket under the Workplace Charging Scheme for state-funded education institutions until 31 March 2027, and the school can buy and grant-fund chargers without waiting for a PPA to be approved.

Sources

All checked 17 September 2026.

Back to blog school solar PPAsolar PV school canopiesDfE power purchase agreement

Free canopy feasibility study

Get your site-specific canopy figures — within 5 working days

Tell us your car park size and we return a desk-based feasibility study: indicative system size in kWp, a PVSyst-modelled annual generation figure, turnkey capital cost band, first-year Annual Investment Allowance saving, projected payback, and any planning or DNO issues we can see from the outset. No site visit needed to start.

Why we ask: the car park size and postcode are what let us size the array and model regional yield — without them the numbers would be generic.

What we won't do: we do not run a lead auction, we never pass your details to multiple installers, you won't be added to a marketing list, and we won't call you unless you ask us to. We are a specialist commercial canopy information resource, not an installer — where a project proceeds we introduce vetted installers with your permission.