About commercialsolarcanopy.co.uk

An independent guide to solar car park canopies for UK businesses and public bodies — what they cost, how they are engineered and consented, and whether one makes sense for your site. We are not an installer.

Who publishes this site

This site is published by SEO Dons Ltd, a company registered in England and Wales (company number 16766013). It is a specialist information and assessment service for one narrow subject: solar canopies built over car parks, walkways and service yards. We do not design, manufacture or install canopies, we hold no installer accreditations of our own, and we have no completed installations to show you. If a website in this niche claims otherwise, ask it for the certificate number and check it yourself.

What we do offer is the part of a canopy project that is hardest to get independently: a clear read of how the structure is sized and priced, which consents actually apply to your site, how the grid connection works, and which funding routes are genuinely open — before anyone tries to sell you a system.

What we will and will not do

Why a canopy is its own subject

A rooftop array bolts onto a structure that already exists. A canopy is the structure: a steel frame on its own foundations, designed for wind and snow loading, with clearance for vehicles, drainage and lighting, and usually cable routes for EV chargers. That changes almost everything about the project — the cost per kilowatt, the consent route, the structural sign-off, the grid application and the business case. Most of the confusion we see comes from applying rooftop assumptions to a canopy, which is why the cost guide, the planning guide and the structure types are the most detailed pages on this site.

How to check any installer you speak to

The certifications that matter belong to the contractor who builds your canopy, so check them against the issuing body rather than a logo on a website:

How our figures are sourced

Grant amounts, tariffs, thresholds and deadlines on this site carry a source and a date, and the volatile ones are re-checked rather than left to age. Where a figure is modelled — a payback period for an example car park, say — we say so. Where a scheme has closed, we say that too: the Public Sector Decarbonisation Scheme, which many canopy guides still describe as open, closed to new applications in November 2024, and the grants and funding page sets out what remains.

If you spot something out of date or wrong, tell us on the contact page and we will correct it and date the correction.

Free canopy feasibility, within five working days

Send us your electricity use and a plan of the car park. We will tell you what fits, what it is likely to cost and whether it is worth pursuing — including when it is not.

Free canopy feasibility study

Get your site-specific canopy figures — within 5 working days

Tell us your car park size and we return a desk-based feasibility study: indicative system size in kWp, a PVSyst-modelled annual generation figure, turnkey capital cost band, first-year Annual Investment Allowance saving, projected payback, and any planning or DNO issues we can see from the outset. No site visit needed to start.

Why we ask: the car park size and postcode are what let us size the array and model regional yield — without them the numbers would be generic.

What we won't do: we do not run a lead auction, we never pass your details to multiple installers, you won't be added to a marketing list, and we won't call you unless you ask us to. We are a specialist commercial canopy information resource, not an installer — where a project proceeds we introduce vetted installers with your permission.